cost of excavation per cubic meter in nigeria

94518, Concord, California - February 2, 2019 Excavation Equipment Rentals $1,500.00 to $2,400.00 per hour to rent $1,300.00 to $1,500.00 per day for backhoe loader (8 hours) Contractors profit is also added to the total cost of labors and machineries. 5000. Swiss roofing sheet – N3, 000 – N4, 000 per square meter. 94A Allen Avenue,    Ikeja, Lagos State Then multiply by all columns of the same type to get a final value. Therefore, our calculations show that the cost of road construction in Nigeria is between ₦ 300 million to ₦ 1.5 billion per kilometer. Excavation is all about preparing a site for development. On my current project, I received a quotation of 600k for materails only and may need to add extra 50 to 100k for labour. Become VIP Member. Find excavation costs in South Africa! 45 mm thick – ₦1,700 per square meter Its cost per day including driver and fuel is Rs. Its cost per day including driver and fuel is Rs. Site clearance/Excavation & Earthworks 1 Cutting down trees and removal from site nr 2,350.00 3,172.50 2 Cutting down Shrubs & undergrowth and remove from site sm 65.00 87.75 3 Excavate top soil av. This will cost about 50 6 inches block (depending on the land topography, it may be slightly more or less) – Half trip of sand (for plastering and coaching ) – Half trip of gravel (for concrete cover) – About 11 standard rods When you join you get additional benefits. ..... 90 Table 75. Aluminium roofing sheets. Then grand total gives the rate of excavation per 10m3 of soil excavation. Log in to TheConstructor to ask questions, answer people’s questions, write articles & connect with other people. Sorry, you do not have permission to ask a question, You must log in to ask a question. 1 piece of 25 mm steel rod cost N4,500 to N4, 8000. Swiss Roofing sheet.     Nigeria, Excavate topsoil maximum depth not exceeding 150mm, Deposite excavated materials in temporary spoil heap as directed, Excavate for trench maximum depth not exceeding 1.00m, Backfill with approved material as directed to sides of excavation, Level and compact bottom of excavation to receive concrete bed, Provide for approved antitermite treatment to be poured to the face of excavation - Side, Provide for approved antitermite treatment to be poured to the face of excavation -Bottom. Lost your password? Then the cost of 10m3 of excavation can be calculated as: No. Labour and supervision cost (say) = ₦30,000. When you join you get additional benefits. The cost of excavation depends on the depth of excavation, type of soil, method of excavation to be carried out and the distance where the excavated soil has to be disposed. In the above example, the coefficient of quantity of hydraulic excavator, tractor / dumper and unskilled labors are based on their capacity per day (8 hours of work). Which instrument is widely used for surveying? The next step is the digging process. 150mm deep & rem. We will not go into the details about the same. Lead distance and transport for carrying excavated soil, Method of excavation – manual excavation or mechanical excavation. For more detail about construction visit gharexpert.com website. The estimate is presented from the point Which type of reinforcement are used in pre-stressing? For othe reference price list, kindly check the item below: 74 pieces (1 ton) of 20 mm steel rod cost N180,000 to N185,000. Excavation Renovation Costs. In general, excavation and earthmoving rates range from $80/hr to $100+/hr. Country Total cost of setting out = ₦53,000 (2) Excavation works (a) Excavation of 19 column bases according to structural drawings to a depth not less than 1200 mm to receive blinding for pad foundation – Total volume = 42.42 m 3 19 column bases @ ₦1000 = ₦19,000 Operation: Excavation by hand Crew composition: 3 laborers; Foreman (on 50%-time basis) Laborer wage: 30 SR/hr Foreman’s wage: 40 SR/hr Crew previously excavated 40 m3 of similar material in 16 hours Crew rate = (3 x 30 + 0.5 x 40) = 110 SR/hr Productivity = 40/16 = 2.50 m3/hr Unit Cost = 110 / 2.50 = 44 SR/m3 Average costs and comments from CostHelper's team of professional journalists and community of users. How much excavation should cost. Fibre britment roofing sheets- N2,300 per square metre. Join TheConstructor to ask questions, answer questions, write articles, and connect with other people. Following points to be noted before starting rate analysis of soil: We will see an example of excavation of soft soil for a depth up to 1.5m and lead distance of 50m per 10m3 of concrete. Many factors influence the depth of excavation. Rate analysis of excavation in earthwork is the measure of quantity of excavation to be carried out, the cost of equipment, machineries and labors required for the same. Excavation in earthwork for soft soil for a lead distance of 1km for following depths: 2. All Rights Reserved. This process does not require so much. A scraper may cost $1.20 per metre on its minimum cycle distance, but you can triple the haul length from 130 to 400 metres for almost no difference per cubic metre of load. For our example say (3.15 - 0.45) * 2 = 5.4m. To determine the unit cost of dredging, divide the gross production cost by the number of pay cubic yards removed. Cost for CMP with 3"x1" and 5"x1" Corrugations and 0.138 (10ga) Thickness. 5 min read. The trucks travel from one customer to another, dropping off two yards here, a yard there, three yards somewhere else, and so on until the load is gone. For Contractors and Developers » Valid May 1, 2012; STRENGTH: PRICE PER CUBIC METER. Metcoppo sheet ( 0.55 mm thick) – N2,200 – N2, 500 per square meter. Please can anyone help me and tell me the cost of a cubic metre 25 and 30 N/mm2 readymix concrete delivered to a site in Lekki on Victoria Island,do you use ready mix deliveries in Lagos? The cost of hydraulic excavator for 10m3 excavation = 0.04125×5000 = Rs.206.25. If the price is, say, $60 per yard, the customer taking only one yard finds the full cost is $310 per yard. Actual costs will depend on job size, conditions, and options. The cost of road maintenance, on the other hand, varies from about ₦ 100 million to ₦ 1 billion per kilometer. 42 pieces (1 ton) of 25 mm steel rod cost N180,000 to N185,000. Cost for CMP with 3"x1" and 5"x1" Corrugations and 0.109 (12ga) Thickness. The price is usually double if deeper 1 m. You should take it into account and specify an average price per 1 m³ (you have to enter the price of 1 m³ to excavate and price of 1 m³ to transport); volume of basement excavation; Title: Excavation Cost Estimating Example Author: Photios G. Ioannou Subject: CEE 431 Construction Contracting Created Date: 10/28/1999 10:32:08 PM A standard septic tank in Nigeria is 8 by 10. Wellington 15 days ago. Excavation and earthmoving services cost $90/hr on average. Cost per Cut for Labor and Equipment to Cut a Skew or Bevel Culvert Pipe End..... 90 Table 77. Say we have 6 numbers of 225mm * 225mm columns, final volume of concrete is 0.29 * 6 = 1.72 cubic metres. During tendering of civil engineering works, all the possible combinations are presented for quotations depending on the project requirements and site conditions. You can expect to pay anywhere to $150/hour for the combined service of an excavator and tip truck and around $90/hour for a bobcat or two-tonne excavator. G235 Borrow Excavation 1 $1,902,560 368,000 m3 $5.17 G236 Borrow Excavation ‐ Contractor's Supply 4 $783,570 27,260 m3 $28.74 G239 Overhaul 1 $1,016,246 2,162,225 m3.km $0.47 G248 Common and/or Borrow Excavation Loaded to T 1 $210,000 4,200 m3 $50.00 G270 Sideslope Improvement 4 … The cost of excavation based on depth is generally divided into categories as: The depth of excavation required varies from project to project and from place to place. You will receive a link and will create a new password via email. What are you looking for? Table 74. »More detailed This can still change depending on things like the size of the area to be excavated and the difficulty of access. In what case is a Shear Key provided in Foundation? The cost of hydraulic excavator for 10m 3 excavation = 0.04125×5000 = Rs.206.25. Rate Analysis of Excavation in Earthwork -Calculate Cost of Excavation, Types of Drawings Prepared by Structural Engineers, Rate Analysis of Plastering with Cement Mortar -Material Quantity Calculation. You can expect to pay anywhere from $95/hour for a bobcat or two-tonne excavator, to $140/hour for the combined service of an excavator and tip truck. 15 MPa: $141.92; 17.5 MPa: $149.11; 20 MPa: $155.98; 25 MPa »More detailed I should mention however, that the designs are slightly different which explains the big difference in cost. From site cm 139.00 188 4 Meter Square: ₦ 100: Excavate topsoil maximum depth not exceeding 150mm: Topsoil Excavation: Meter Square: ₦ 100: Deposite excavated materials in temporary spoil heap as directed: Topsoil Excavation: Meter Square: ₦ 100: Excavate for trench maximum depth not exceeding 1.00m: Trench Excavation: Meter Cubed: ₦ 1,500: Ditto pits for column pads foundation Likewise, based on the capacity of other equipment, labors etc., their cost is calculated. Then its capacity considered is ((1×10)/0.04125) = 242.4242 m3 / day. Below are the list of excavation man hour either using an excavator or manual labor only. In the average residential setting, an excavation must start with removing trees, digging, and then, grading the land. Nigeria is obviously the highest with 40% or more. excavation costs – Be aware! of days required for 10m3 excavation = 10/242.4242 = 0.04125 days. Therefore volume of concrete needed for one column is 0.23 * 0.23 *5.4 =0.29 cubic metres. Sway and Non-sway Frames: What is the Difference Between the ... How to Calculate Deductions for Plastering and Painting Works as ... Types of Foundation for Buildings and their Uses [PDF], Compressive Strength of Concrete -Cube Test [PDF], Procedure, Results, Methods of Rainwater Harvesting [PDF]: Components, Transport, and Storage, 16 Types of Heavy Equipment Used in Construction, Standard Size of Rooms in Residential Building and their Locations, Elon Musk’s Boring Company Completes its First Loop, Royal Gorge Bridge: Structural Elements of the Highest Bridge in the US. Costs are computed based on excavation time, transportation time, and disposal time. Manual Bulk Excavation: Shs 225 per Cubic Metre in the Western region, Shs 275 per Cubic Metre in the Nairobi region, and Shs 210 Cubic in the Coastal Region. Current Construction Workers' Labour Rates in Nigeria 2018 (Osaz'Index) Engr. Summarizing above points, it can be seen that the rate analysis for excavation work can be divided by following ways: The first method is the selection of type of soil to be excavated and lead distance where the soil has to be disposed off. Rate Analysis of Civil Works -Elements and Requirements, Rate Analysis of Plastering with Cement Mortar -Quantity Calculation, Quantity of Cement & Sand Calculation in Mortar, Analysis of Rates for Civil Engineering Works, Quantity & Rate Analysis for Reinforced Concrete. What is the rough Cost of conncrete (1:2:4) per cubic meter … What is the rough Cost of conncrete (1:2:4) per cubic meter? Excavation in earthwork for hard soil/ hard rock for a lead distance of 1km for following depths: In the above examples of excavation, more number of descriptions are possible with different lead distance and type of soil. View Gumtree Free Online Classified Ads for excavation costs and more in South Africa. What is Onsite Wastewater Treatment System (OWTS)? Lets say for 10m3, the hydraulic excavator is taking 0.04125 day. Sample takeoffs and cost estimates are included in this paper. This is in preparation for laying down a foundation. ..... 90 Table 76. What is piping technology for termite treatment in building? Cost of Digging and Excavation. Become VIP Member, Do you need to remove the ads? Cost of hiring a professional. Likewise, based on the capacity of other equipment, labors etc., their cost is calculated. … The general rate is Rs110-00 per cft. (a) To clear and excavate to rock: Cost per cubic meter solid rock = $0.10 (b) To drill and blast at a production rate of 140 cubic meters per hour Cost per cubic meter solid rock = $2.42 Select a country…Åland IslandsAfghanistanAlbaniaAlgeriaAndorraAngolaAnguillaAntarcticaAntigua and BarbudaArgentinaArmeniaArubaAustraliaAustriaAzerbaijanBahamasBahrainBangladeshBarbadosBelarusBelauBelgiumBelizeBeninBermudaBhutanBoliviaBonaire, Saint Eustatius and SabaBosnia and HerzegovinaBotswanaBouvet IslandBrazilBritish Indian Ocean TerritoryBritish Virgin IslandsBruneiBulgariaBurkina FasoBurundiCambodiaCameroonCanadaCape VerdeCayman IslandsCentral African RepublicChadChileChinaChristmas IslandCocos (Keeling) IslandsColombiaComorosCongo (Brazzaville)Congo (Kinshasa)Cook IslandsCosta RicaCroatiaCubaCuraÇaoCyprusCzech RepublicDenmarkDjiboutiDominicaDominican RepublicEcuadorEgyptEl SalvadorEquatorial GuineaEritreaEstoniaEthiopiaFalkland IslandsFaroe IslandsFijiFinlandFranceFrench GuianaFrench PolynesiaFrench Southern TerritoriesGabonGambiaGeorgiaGermanyGhanaGibraltarGreeceGreenlandGrenadaGuadeloupeGuatemalaGuernseyGuineaGuinea-BissauGuyanaHaitiHeard Island and McDonald IslandsHondurasHong KongHungaryIcelandIndiaIndonesiaIranIraqIsle of ManIsraelItalyIvory CoastJamaicaJapanJerseyJordanKazakhstanKenyaKiribatiKuwaitKyrgyzstanLaosLatviaLebanonLesothoLiberiaLibyaLiechtensteinLithuaniaLuxembourgMacao S.A.R., ChinaMacedoniaMadagascarMalawiMalaysiaMaldivesMaliMaltaMarshall IslandsMartiniqueMauritaniaMauritiusMayotteMexicoMicronesiaMoldovaMonacoMongoliaMontenegroMontserratMoroccoMozambiqueMyanmarNamibiaNauruNepalNetherlandsNetherlands AntillesNew CaledoniaNew ZealandNicaraguaNigerNigeriaNiueNorfolk IslandNorth KoreaNorwayOmanPakistanPalestinian TerritoryPanamaPapua New GuineaParaguayPeruPhilippinesPitcairnPolandPortugalQatarRepublic of IrelandReunionRomaniaRussiaRwandaSão Tomé and PríncipeSaint BarthélemySaint HelenaSaint Kitts and NevisSaint LuciaSaint Martin (Dutch part)Saint Martin (French part)Saint Pierre and MiquelonSaint Vincent and the GrenadinesSan MarinoSaudi ArabiaSenegalSerbiaSeychellesSierra LeoneSingaporeSlovakiaSloveniaSolomon IslandsSomaliaSouth AfricaSouth Georgia/Sandwich IslandsSouth KoreaSouth SudanSpainSri LankaSudanSurinameSvalbard and Jan MayenSwazilandSwedenSwitzerlandSyriaTaiwanTajikistanTanzaniaThailandTimor-LesteTogoTokelauTongaTrinidad and TobagoTunisiaTurkeyTurkmenistanTurks and Caicos IslandsTuvaluUgandaUkraineUnited Arab EmiratesUnited Kingdom (UK)United States (US)UruguayUzbekistanVanuatuVaticanVenezuelaVietnamWallis and FutunaWestern SaharaWestern SamoaYemenZambiaZimbabwe, By registering, you agree to the Terms of Service and Privacy Policy .*. Their coefficient per m3 or per 10m3 should be considered for calculation. © 2009-2021 The Constructor. Cost Of Excavation: Manual labor was used, soil is very hard and rocky at some point so the cost of excavation would be around N35,000 Note: The septic tank is designed in such a way that a car will be able to park on the top of it. Then the cost of 10m 3 of excavation can be calculated as: No. may occupy 0.9 cubic meter. ... Dulux Paint Price List in Nigeria (2021) Cost of Aluminium Roofing Sheets in Nigeria (2021) ... (Per Square Meter) 2021; White Cement Price in Nigeria (2021 Updates) Turkish Doors Prices in Nigeria (April 2021) Search. Our optimum services are provided with complete quality assurance and well-tested on several aspects. Excavators are extremely flexible machines, able to "bench" their way in to jobs a scraper could … We can quote on bulk and detailed excavations based on a per cubic meter rate, per tonne rate, or as a lump sum price so you are aware of all the costs and can stay within your budget. For these project bids, consider an excavation cost of up to $270 per cubic yard. of days required for 10m 3 excavation = 10/242.4242 = 0.04125 days. Fibre britment step-tile roofing sheets- N3,500 per square metre. Osaz', your contractor of first choice keeps you up-to-date with the current labour rates for the construction industry across Nigeria. For example, excavation support, dewatering, Then the other variable that is considered is the depth of excavation and is presented in the rate analysis description as follows: 1.

Red Canary Stock, Wrought Iron Deck Railing Panels, Clack Water Softener Head, Vibrating Cone Filling Machine, Garage Organization Home Depot, Floral Lace Veil, Styling Head For Older Child, Matt Austin News,



Leave a Reply